Project Dashboard

Status: ACTIVE MONITORING

  • NIRB File No:

    08MN053

  • Application No.:

    123910

  • Project Type:

    Mine Development

  • Project Name:

    Mary River Project

Applicant
Primary Contact
External Links

Mary River Project

Assessment Phase / Activity
  • NIRB Notice to Parties re comments received 2020-02-14
  • Send Notification to Parties 2020-02-13
  • Send Notification to Parties 2020-02-11
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2020-02-10
  • Additional Plans: Due Date set 2020-02-04
  • NIRB Notice to Parties re receipt of final written submissions 2020-02-03
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2020-01-29
  • NIRB Notice to Parties re proponent response to final written submissions 2020-01-28
  • Additional Plans: Due Date set 2020-01-28
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • Send Notification to Parties 2020-01-24
  • NIRB Ltr to Parties re Community Representatives for Community Roundtable at Public Hearing 2020-01-24
  • NIRB Ltr to Parties re Community Representatives for Community Roundtable at Public Hearing 2020-01-24
  • NIRB Ltr to Parties re Community Representatives for Community Roundtable at Public Hearing 2020-01-24
  • NIRB Ltr to Parties re Community Representatives for Community Roundtable at Public Hearing 2020-01-24
  • NIRB Ltr to Parties re Community Representatives for Community Roundtable at Public Hearing 2020-01-24
  • Additional Plans: Due Date set 2020-01-21
  • Send Notification to Parties 2020-01-20
  • NIRB Issues Site Visit Report 2020-01-20
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2020-01-10
  • NIRB Notice to Parties re comments received 2020-01-07
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2020-01-07
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2020-01-07
  • Send Notification to Parties 2020-01-02
  • Send Notification to Parties 2019-12-17
  • Send Notification to Parties 2019-12-16
  • Send Notification to Parties 2019-12-16
  • NIRB Notice to Parties re receipt of Project Certificate Consideration Request 2019-12-09
  • NIRB Issues Site Visit Report 2019-12-02
  • Send Notification to Parties 2019-12-02
  • NIRB Notice to Parties re Final Hearing Transcripts 2019-11-29
  • Send Notification to Parties 2019-11-26
  • NIRB Notice to Parties re Final Hearing Transcripts 2019-11-26
  • Send Notification to Parties 2019-11-22
  • Send Notification to Parties 2019-11-21
  • Additional Plans: Due Date set 2019-11-19
  • Send Notification to Parties 2019-11-18
  • Send Notification to Parties 2019-11-15
  • Send Notification to Parties 2019-11-15
  • Send Notification to Parties 2019-11-14
  • Send Notification to Parties 2019-11-13
  • Send Notification to Parties 2019-11-13
  • Send Notification to Parties 2019-11-01
  • Send Notification to Parties 2019-11-01
  • Send Notification to Parties 2019-11-01
  • Send Notification to Parties 2019-10-31
  • Send Notification to Parties 2019-10-30
  • Send Notification to Parties 2019-10-29
  • Send Notification to Parties 2019-10-28
  • Send Notification to Parties 2019-10-25
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2019-10-25
  • NIRB Ltr to Dist re Draft Hearing Agenda 2019-10-25
  • Additional Plans: Due Date set 2019-10-18
  • Additional Plans: Due Date set 2019-10-17
  • NIRB Notice to Parties re proponent response to final written submissions 2019-10-17
  • Additional Plans: Due Date set 2019-10-15
  • NIRB Ltr to Mayor re Opening Remarks 2019-10-10
  • Additional Plans: Due Date set 2019-10-10
  • Additional Plans: Due Date set 2019-10-10
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-10-10
  • NIRB Notice to Parties re receipt of Proponent response to site visit follow up 2019-10-07
  • Send Notification to Parties 2019-10-04
  • Send Notification to Parties 2019-10-04
  • Send Notification to Parties 2019-10-04
  • NIRB Issues Site Visit Report 2019-10-03
  • Send Notification to Parties 2019-10-02
  • Additional Plans: Commenting started 2019-10-02
  • NIRB Notice to Parties re receipt of final written submissions 2019-09-30
  • NIRB Notice to Parties re receipt of final written submissions 2019-09-30
  • Send Notification to Parties 2019-09-27
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Send Notification to Parties 2019-09-24
  • Additional Plans: Commenting started 2019-09-23
  • NIRB Notice to Parties re receipt of final written submissions 2019-09-23
  • Additional Plans: Due Date set 2019-09-19
  • Additional Plans: Due Date set 2019-09-18
  • Additional Plans: Due Date set 2019-09-16
  • Additional Plans: Due Date set 2019-09-06
  • Additional Plans: Due Date set 2019-09-06
  • Additional Plans: Due Date set 2019-09-06
  • Additional Plans: Due Date set 2019-09-06
  • Additional Plans: Due Date set 2019-09-06
  • Additional Plans: Due Date set 2019-09-06
  • Additional Plans: Due Date set 2019-09-04
  • NIRB Issues notification of planned site visit 2019-08-29
  • NIRB Issues Site Visit Report 2019-08-28
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-08-28
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-08-27
  • NIRB Notice to Parties re Public Hearing Date Set 2019-08-22
  • NIRB Notice to Parties re Public Hearing Date Set 2019-08-21
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-08-20
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-08-15
  • Additional Plans: Due Date set 2019-07-30
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-07-25
  • NIRB Notice to Parties re receipt of Project Certificate Consideration Request 2019-07-25
  • NIRB Notice to Parties re Public Hearing Date Set 2019-07-25
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-07-25
  • Additional Plans: Due Date set 2019-07-19
  • Additional Plans: Due Date set 2019-07-19
  • Additional Plans: Due Date set 2019-07-17
  • Additional Plans: Due Date set 2019-07-16
  • NIRB Notification to Parties Comments Received 2019-07-16
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-07-16
  • NIRB received correspondence form Proponent and / or parties re anticipated IR response date 2019-07-15
  • Send Notification to Parties 2019-07-04
  • Send Notification to Parties 2019-06-28
  • NIRB Notification to Parties Comments Received 2019-06-25
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2019-06-25
  • Send Notification to Parties 2019-06-24
  • Send Notification to Parties 2019-06-17
  • Send Notification to Parties 2019-06-17
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-06-17
  • Send Notification to Parties 2019-06-17
  • Send Notification to Parties 2019-06-17
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-06-14
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-06-14
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2019-07-12
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-06-14
  • NIRB Notification to Parties Comments Received 2019-06-12
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-06-12
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-06-07
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2019-06-07
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-06-06
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2019-06-06
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2019-06-06
  • Additional Plans: Due Date set 2019-06-04
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-05-31
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-05-31
  • NIRB Ltr to Parties re Community Information summary report 2019-05-28
  • Send Notification to Parties 2019-05-27
  • Additional Plans: Due Date set 2019-05-27
  • Additional Plans: Due Date set 2019-05-27
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-05-27
  • Technical advisor assigned 2019-05-22
  • Technical advisor assigned 2019-05-22
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-05-16
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-05-16
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-05-14
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2019-05-10
  • Additional Plans: Commenting 2019-05-08
  • NIRB Ltr to Parties re Community Information summary report 2019-05-06
  • Additional Plans: Due Date set 2019-05-01
  • Additional Plans: Due Date set 2019-04-29
  • NIRB Ltr to Parties requesting comments on report. 2019-04-29
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-04-26
  • Technical advisor assigned 2019-04-18
  • Technical advisor assigned 2019-04-18
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-04-18
  • NIRB Notice receipt of comments 2019-04-15
  • NIRB Received Report From Proponent 2019-04-10
  • Additional Plans: Due Date set 2019-04-10
  • NIRB Received Report From Proponent 2019-04-08
  • Send Notification to Parties 2019-04-08
  • Send Notification to Parties 2019-04-05
  • Additional Plans: Due Date set 2019-04-05
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-04-05
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-04-03
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-03-29
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-03-27
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-03-27
  • Send Notification to Parties 2019-03-26
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-03-26
  • Guidelines: NIRB issues guidelines to proponent 2019-03-19
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-03-19
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-03-18
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-03-14
  • Additional Plans: Commenting 2019-03-13
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-03-11
  • Additional Plans: Due Date set 2019-03-06
  • NIRB Notice to Parties re receipt of Proponent response to site visit follow up 2019-03-04
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-03-04
  • Additional Plans: Commenting 2019-03-04
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-03-01
  • Additional Plans: Commenting 2019-03-01
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2019-03-01
  • Additional Plans: Commenting 2019-02-25
  • NIRB Notice to parties re receipt of IR responses 2019-02-12
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-02-12
  • NIRB Notice to Parties re Proponent response received 2019-02-11
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-02-11
  • Send Notification to Parties 2019-02-05
  • Send Notification to Parties 2019-02-05
  • Send Notification to Parties 2019-02-04
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-02-04
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-01-30
  • NIRB Notice to Parties re acceptance of intervenor status 2019-01-24
  • NIRB Ltr to Proponent and Parties re IRs requiring a response 2019-01-24
  • Send Notification to Parties 2019-01-14
  • Send Notification to Parties 2019-01-02
  • Send Notification to Parties 2019-01-02
  • NIRB Notice to Parties re Proponent Response received 2018-12-24
  • Send Notification to Parties 2018-12-21
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2019-02-21
  • NIRB Notice to parties re receipt of IR responses 2018-12-19
  • NIRB Notice to parties re receipt of IR responses 2018-12-18
  • NIRB Notice to Parties re receipt of final written submissions 2018-12-17
  • NIRB Notice to Parties re Proponent Response received 2018-12-17
  • Send Notification to Parties 2018-12-17
  • Send Notification to Parties 2018-12-17
  • Send Notification to Parties 2018-12-11
  • NIRB received correspondence form Proponent and / or parties re anticipated IR response date 2019-01-09
  • NIRB Ltr to Proponent and Parties re IRs requiring a response 2018-12-31
  • Send Notification to Parties 2018-11-28
  • NIRB Ltr to Proponent and Parties re IRs requiring a response 2018-11-28
  • Send Notification to Parties 2018-11-21
  • Technical advisor assigned 2018-11-21
  • Technical advisor assigned 2018-11-21
  • NIRB Ltr to Parties re submission of Information Requests 2018-11-21
  • Send Notification to Parties 2018-11-14
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2018-11-14
  • NIRB Issues Amended Project Certificate to Proponent 2018-11-07
  • NIRB Ltr to Parties re submission of Information Requests 2018-11-07
  • NIRB Issues Amended Project Certificate to Proponent 2018-10-30
  • NIRB Ltr to Parties re FEIS Technical Review and Submission of Technical review comments 2018-11-13
  • NIRB issues notice of receipt of final EIS submission 2018-10-10
  • NIRB Received Minister’s decision re Final Hearing Report 2018-10-02
  • NIRB Received Minister’s decision re Final Hearing Report 2018-10-02
  • NIRB Ltr to Proponent re FEIS Compliance Determination 2018-09-14
  • NIRB Ltr to Minister(s) re Final Hearing Report 2018-08-31
  • NIRB Ltr to Minister(s) re Final Hearing Report 2018-08-31
  • NIRB issues notice of receipt of final EIS submission 2018-08-23
  • Guidelines: NIRB issues guidelines to proponent 2018-08-21
  • NIRB Notice to Parties re proponent response to final written submissions 2018-08-10
  • NIRB issues notice of community information sessions 2018-08-03
  • NIRB issues notice of community information sessions 2018-08-01
  • NIRB Notice to Parties re receipt of final written submissions 2018-07-27
  • NIRB Ltr to Parties re anticipated FEIS submission date 2018-07-26
  • NIRB Ltr to Parties re anticipated FEIS submission date 2018-07-19
  • Send Notification to Parties 2018-07-17
  • NIRB Notice to Parties re comments received 2018-07-12
  • Send Notification to Parties 2018-07-10
  • NIRB issues notice of community information sessions 2018-06-29
  • NIRB Notice to Parties re receipt of final written submissions 2018-06-27
  • NIRB Notice to Parties re receipt of Project Certificate Consideration Request 2018-06-26
  • NIRB Notice to Parties re receipt of Project Certificate Consideration Request 2018-06-11
  • NIRB Notice to Parties re receipt of Project Certificate Consideration Request 2018-06-06
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2018-07-12
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2018-05-30
  • NIRB Ltr to Parties requesting comments on report. 2018-05-14
  • NIRB Ltr to Parties requesting comments on report. 2018-04-23
  • NIRB Issues notification of planned site visit 2018-03-16
  • Send Notification to Parties 2017-12-12
  • NIRB Notice to Parties re comments received 2017-11-30
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2018-01-19
  • NIRB Ltr to parties requesting comment on potential project certification reconsideration 2017-11-27
  • NIRB Ltr to Proponent re Conformity Determination required 2017-11-14
  • NIRB Ltr to parties requesting comment on potential project certification reconsideration 2017-11-17
  • NIRB Ltr to Proponent re reconsideration of Project Certificate 2017-10-26
  • NIRB Notice to Parties re receipt of Project Certificate Consideration Request 2017-09-29
  • NIRB Ltr to proponent re additional information required 2017-09-22
  • NIRB Notice to Parties re receipt of Project Certificate Consideration Request 2017-09-13
  • NIRB Notice to Parties re receipt of Project Certificate Consideration Request 2017-09-07
  • NIRB Notice to Parties re receipt of Project Certificate Consideration Request 2017-09-06
  • NIRB Notice to Parties re receipt of Project Certificate Consideration Request 2017-09-01
  • Send Notification to Parties 2017-09-01
  • Send Notification to Parties 2017-08-31
  • NIRB Issues Correspondence to Parties re Project Certificate Terms and Conditions 2017-08-22
  • NIRB Ltr to proponent re additional information required 2017-08-21
  • NIRB Issues notification of planned site visit 2017-08-01
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2017-07-28
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2017-07-04
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2017-05-30
  • NIRB Ltr to Parties requesting comments on report. 2017-05-31
  • NIRB issues Notification to Proponent re Reporting Requirements Reminder (this is done annually) 2017-04-06
  • NIRB issues notice of community information sessions 2017-03-14
  • NIRB issues notice of community information sessions 2017-03-13
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2016-12-21
  • Issued Correspondence to Proponent Re Conformity Determination Required Prior to Potential Reconside 2016-12-19
  • Issued Correspondence to Proponent Re Conformity Determination Required Prior to Potential Reconside 2016-12-15
  • NIRB Notice to Parties re Proponent response received 2016-12-15
  • Issued Correspondence to Proponent Re Conformity Determination Required Prior to Potential Reconside 2016-12-07
  • NIRB Notice to Parties re receipt of Project Certificate Consideration Request 2016-12-02
  • Issued Correspondence to Proponent Re Conformity Determination Required Prior to Potential Reconside 2016-11-03
  • Issued Correspondence to Proponent Re Conformity Determination Required Prior to Potential Reconside 2016-10-28
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2016-08-04
  • NIRB Notification to Proponents Received 2016-06-30
  • Annual Report: Commenting completed 2016-06-27
  • NIRB Received Report From Proponent 2016-04-22
  • Technical advisor assigned 2016-01-29
  • Started project monitoring 2010-07-15
Region
  • North Baffin
Project Images
Document Categories (click to open)
Click on document name to download it, or select the document to add to a download list.
Click on the icon to preview PDF.  Click on the sign to view document details.
Documents within selected category
Display per page:
Comment Form for NIRB Screenings

We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).

Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...

Register an Account