Project Dashboard

Status: ACTIVE MONITORING

  • NIRB File No:

    12MN036

  • Application No.:

    124149

  • Project Type:

    Mine Development

  • Project Name:

    Back River Project

Applicant
  • Sabina Gold & Silver Corp., Matthew Pickard
  • Sabina Gold & Silver Corp., Matthew Pickard
  • Suite 202-930 West 1st St., Suite 202, Vancouver, BC V7B 3N4, Phone: 604-998-4175, Email: mpickard@sabinagoldsilver.com
  • , Canada
  • mpickard@sabinagoldsilver.com
Primary Contact

The Back River Project was assessed by the NIRB from 2012-2017. On June 15, 2016 the NIRB recommended in its decision to the Responsible Ministers that the project should not be allowed to proceed at this time. In January 2017, the then Minister of Indigenous and Northern Affairs responded to the Board’s decision indicating that the responsible Ministers were referring the report back to the Board for further review or public hearings as the report was not clear with respect to some ecosystemic issues. The NIRB then provided Sabina with an opportunity to submit any updates in an FEIS addendum. On July 18, 2017 the NIRB issued a revised Final Hearing report to the Responsible Ministers, which built on the 2016 Final Hearing Report and provided a summary of all information provided to the Board throughout the Review of the Project, including all information provided to the Board prior to and during both public hearings. The project was approved to proceed on December 19, 2017 subject to the terms and conditions of Project Certificate No.007. This project dashboard contains the original assessment information as well as monitoring information.



The Back River Project consists of the proposed mobilization, construction, operation, closure, reclamation, and post-closure monitoring of a gold mine operation in the Kitikmeot region of Nunavut. The Project is located approximately 400 kilometres (km) southwest of the community of Cambridge Bay, 95 km southeast of the southern end of Bathurst Inlet, and 520 km northeast of Yellowknife, Northwest Territories. The Project includes two (2) main development areas with a winter ice road interconnecting the Goose Property with the Marine Laydown Area (MLA) located at Bathurst Inlet.



The Goose Property will comprise of a processing plant, four (4) deposits (Umwelt, Llama, Echo, and Goose Main) to be mined through open and underground mining methods; an all-weather air strip; a camp facility; and associated mining facilities. Ore mined at the Goose Property will be hauled to ore stockpiles located at the Goose Site where the ore would be processed within an ore processing plant (mill) using conventional gravity concentration and cyanidation techniques at approximately 6,000 tonnes of ore per day. A tailings storage facility will be built south-southeast of the Goose Main open pit for tailings deposition during the first two (2) years of production, with tailings then directly deposited into the mined-out Umwelt open pit and later into the mined-out Goose Main open pit for the remaining mine life. The gold doré bars produced at the processing plant will be stored on-site and then transported off-site by aircraft on a semi-weekly basis.



The MLA is located approximately 130 km north-northwest of the Goose Property and is the primary staging area for equipment, material, fuel, and other supplies required for the construction and operation of the Project. The MLA consists of a single barge terminal, laydown areas, a camp facility, and associated storage and maintenance facilities. The Project will be resupplied annually from southern Canada by barge during the open water season. Project materials would then be transported annually from the MLA to the Goose Property using a winter ice road from mid-January to April.



The George Property is an advanced exploration camp located approximately 50 km northwest of Goose Property and currently has four (4) mineral deposits identified for potential future development. Sabina may construct an annual spur road from the winter ice road to the George Property for transportation of supplies to the site.

Assessment Phase / Activity
  • Technical advisor assigned 2024-04-05
  • Technical advisor assigned 2024-03-08
  • NIRB Notice to Parties re Proponent response received 2024-02-19
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2023-12-11
  • Send Notification to Parties 2023-11-15
  • NIRB Issues Site Visit Report 2023-10-10
  • NIRB Notice to Parties re Proponent Response received 2023-08-30
  • Send Notification to Parties 2023-08-29
  • Send Notification to Parties 2023-08-17
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2023-08-17
  • NIRB Ltr to Parties requesting comments on report. 2023-06-16
  • Send Notification to Parties 2023-02-16
  • Send Notification to Parties 2023-02-02
  • NIRB Notice to Parties re Proponent Response received 2023-01-24
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2022-12-06
  • Send Notification to Parties 2022-11-30
  • NIRB Issues Site Visit Report 2022-10-04
  • Send Notification to Parties 2022-08-22
  • NIRB Notice to Parties re Proponent Response received 2022-08-08
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2022-08-08
  • Send Notification to Parties 2022-06-27
  • Send Notification to Parties 2022-06-08
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2022-06-07
  • Send Notification to Parties 2022-05-17
  • NIRB Ltr to Parties requesting comments on report. 2022-05-17
  • Technical advisor assigned 2022-04-06
  • Technical advisor assigned 2022-03-31
  • Send Notification to Parties 2022-01-24
  • Technical advisor assigned 2022-01-20
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2022-01-20
  • NIRB Issues Site Visit Report 2021-09-23
  • NIRB Notice to Parties re Proponent Response received 2021-07-16
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2021-07-16
  • NIRB Notification to Parties Comments Received 2021-06-01
  • Send Notification to Parties 2021-05-19
  • NIRB Ltr to Parties requesting comments on report. 2021-05-25
  • Technical advisor assigned 2021-04-07
  • NIRB Issues Site Visit Report 2020-12-24
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2020-12-04
  • NIRB Issues Site Visit Report 2020-10-22
  • Send Notification to Parties 2020-10-05
  • NIRB issues notice of community information sessions 2020-08-12
  • NIRB Ltr to Proponent re reconsideration of Project Certificate 2020-08-11
  • NIRB issues notice of community information sessions 2020-07-31
  • NIRB Notice to Parties re comments received 2020-07-17
  • Technical advisor assigned 2020-07-17
  • NIRB Notice to Parties re comments received 2020-07-17
  • NIRB Ltr to parties requesting comment on potential project certification reconsideration 2020-07-17
  • NIRB Ltr to parties requesting comment on potential project certification reconsideration 2020-07-10
  • NIRB Ltr to parties requesting comment on potential project certification reconsideration 2020-07-10
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2020-06-26
  • NIRB Notification to Parties Comments Received 2020-05-22
  • Send Notification to Parties 2020-05-13
  • Send Notification to Parties 2020-05-12
  • NIRB Ltr to Parties requesting comments on report. 2020-05-14
  • NIRB Notice to Parties re Proponent response received 2020-01-27
  • NIRB Issues Site Visit Report 2020-01-03
  • NIRB Final Monitoring Report: Sent to Distribution 2019-12-20
  • NIRB Received Report From Proponent 2019-11-18
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2019-10-25
  • NIRB Issues Site Visit Report 2019-10-02
  • NIRB Notice to Parties re Proponent response received 2019-08-12
  • NIRB Notice to Parties re Proponent response received 2019-08-12
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2019-08-12
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2019-06-26
  • NIRB Ltr to Parties requesting comments on report. 2019-06-03
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2019-03-31
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2019-03-31
  • Send Notification to Parties 2018-05-17
  • Send Notification to Parties 2018-05-07
  • Technical advisor assigned 2018-05-03
  • Started project monitoring 2017-12-19
Region
  • Kitikmeot
Project Images
Document Categories (click to open )
Click on document name to download it, or select the document to add to a download list.
Click on the icon to preview PDF.  Click on the sign to view document details.
Documents within selected category
Display per page:
Click on document name to download it, or select the document to add to a download list.
Click on the icon to preview PDF.  Click on the sign to view document details.
Documents within selected category
Display per page:
Comment Form for NIRB Screenings

We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).

Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...

Register an Account