Project Dashboard

Status: ACTIVE MONITORING

  • NIRB File No:

    16MN056

  • Application No.:

    124683

  • Project Type:

    Mine Development

  • Project Name:

    Whale Tail Pit and Haul Road - Meadowbank Gold Project

Applicant
Primary Contact

The Whale Tail Pit Project was assessed by the NIRB from 2016 – 2018. It was approved to proceed on March 15, 2018 subject to the terms and conditions of Project Certificate No. 008. This project dashboard contains the original assessment information as well as monitoring information from 2018 onward.

Modified from the 2016 Project Description: The Whale Tail Pit Project Proposal (the ‘Project’) is the proposed development of a satellite deposit located on the Amaruq Exploration property, approximately 150 kilometres (km) north of the Hamlet of Baker Lake and 50 km northwest of the existing Meadowbank Gold Mine Project (see Application 124588). An estimated 8.3 million tonnes (Mt) of ore will be mined from one open pit (Whale Tail Pit) and processed over three (3) to four (4) years. Ore will be hauled by truck to the approved infrastructure at the Meadowbank Gold Mine for milling. Tailings produced from processing of the Whale Tail Pit ore will be disposed of at the existing Meadowbank Gold Mine tailings storage facility. Construction will begin as early as 2018, operations occurring from 2019 to 2022, and closure from 2022 to 2029. The project anticipates the creation of up to 500 direct jobs through construction, and 561 jobs through operations (total of 931 for both the Whale Tail Pit Project Proposal and the Meadowbank Gold Mine Project).

Project facilities to support mining activities will consist of a camp facility, power plant, heli-pad, maintenance shop, fuel tank farm, waste rock storage facility, ore stockpiling facility, water management infrastructure, water treatment systems, haul roads, and access roads. The accommodations and camp facility will be built for 210 personnel.

The Project will also include the expansion of the existing Amaruq exploration access road from 6.5 metres to 9.5 metres for use as a haul road, in order to accommodate haul trucks and the associated increased traffic. The Proposal will continue to use the existing supporting infrastructure at the Meadowbank Gold Mine site, the all-weather access road between Baker Lake and the Meadowbank Gold Mine site, and the Baker Lake Marshalling Facility.

Assessment Phase / Activity
  • Technical advisor assigned 2023-03-30
  • Technical advisor assigned 2022-10-05
  • Technical advisor assigned 2022-10-05
  • Technical advisor assigned 2022-10-05
  • Technical advisor assigned 2021-10-22
  • Technical advisor assigned 2021-03-31
  • Technical advisor assigned 2021-03-31
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2020-04-16
  • NIRB Issues Monitoring Report and Recommendations for Proponent 2020-03-02
  • NIRB Notice to Parties re Proponent response received 2020-01-31
  • Technical advisor assigned 2020-01-17
  • NIRB Issues Site Visit Report 2019-12-05
  • NIRB Notice to Parties re Proponent response received 2019-11-28
  • NIRB Issues Site Visit Report 2019-10-03
  • NIRB issues notice of community information sessions 2019-07-12
  • Send Notification to Parties 2019-06-26
  • Send Notification to Parties 2019-06-26
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2019-06-26
  • NIRB Ltr to Proponent Opportunity to Respond to Comments 2019-06-18
  • NIRB Notification to Parties Comments Received 2019-05-29
  • NIRB Ltr to Parties requesting comments on report. 2019-05-29
  • NIRB Ltr to Parties requesting comments on report. 2019-05-15
  • NIRB Ltr to Parties requesting comments on report. 2019-04-29
  • NIRB Ltr to Parties requesting comments on report. 2019-04-12
  • NIRB Ltr to Parties requesting comments on report. 2019-04-12
  • Send Notification to Parties 2019-03-06
  • NIRB Notice to Parties re Responsible Authority Response Received 2018-12-18
  • NIRB Notice to Parties re Proponent response received 2018-12-18
  • Send Notification to Parties 2018-12-11
  • Technical advisor assigned 2018-12-07
  • Technical advisor assigned 2018-12-07
  • Technical advisor assigned 2018-12-07
  • Technical advisor assigned 2018-12-04
  • NIRB Issues Monitoring Report and Recommendations to Responsible Authorities 2018-12-03
  • NIRB Issues Monitoring Report and Recommendations to Responsible Authorities 2018-12-03
  • NIRB Issues Monitoring Report and Recommendations to Responsible Authorities 2018-11-07
  • NIRB Issues Monitoring Report and Recommendations to Responsible Authorities 2018-11-07
  • Send Notification to Parties 2018-11-01
  • Send Notification to Parties 2018-09-12
  • Send Notification to Parties 2018-06-12
  • Send Notification to Parties 2018-06-11
  • Send Notification to Parties 2018-06-11
  • Send Notification to Parties 2018-06-11
  • Send Notification to Parties 2018-05-17
  • NIRB Received Report From Proponent 2018-05-09
  • Send Notification to Parties 2018-04-19
  • Started project monitoring 2018-03-15
Region
  • Kivalliq
Project Images
Document Categories (click to open )
Click on document name to download it, or select the document to add to a download list.
Click on the icon to preview PDF.  Click on the sign to view document details.
Documents within selected category
Display per page:
Click on document name to download it, or select the document to add to a download list.
Click on the icon to preview PDF.  Click on the sign to view document details.
Documents within selected category
Display per page:
Comment Form for NIRB Screenings

We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).

Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...

Register an Account