Project Dashboard
Status: COMPLETED SCREENING
-
NIRB File No:
17XN070
-
Application No.:
125250
-
Project Type:
Fuel
-
Project Name:
Iqaluit Bulk Fuel Storage Tank Farm Upgrade
Completed Screening
- Screening Decision Issued 2018-03-22
- File Closed 2018-03-22
Applicant
- QEC
- Maurice Guimond
- Box 580 Bldg 243
- Iqaluit, Nunavut X0A 0H0 Canada
- mguimond@qec.nu.ca
- www.qec.nu.ca
Primary Contact
- QEC
- Maurice Guimond
- Box 580 Bldg 243
- Iqaluit, Nunavut X0A 0H0 Canada
- Tel: (867) 979-7526
- Fax: (867) 979-7519
- mguimond@qec.nu.ca
Regulatory Authorities
External Links
Project Summary
The Iqaluit power plant currently consumes 16 million to 20 million liters of fuel per year. QEC requires multiple fuel transfers throughout the year to ensure adequate volumes of fuel for the required consumption rates. This directly results in an extra cost to the KWh of generated electrical power and the unreliable power supply to the city of Iqaluit. To meet the shortfall in required diesel fuel storage capacity and comply with legislative regulations and codes, QEC plans to construct one additional tank (Tank#2) with a storage capacity of 5.7 million litres in the existing fuel tank farm and replace the farm liner within the berm area which was built in 1993 including the future tank#2 foundation Pad. The proposed upgrade will increase the diesel fuel storage capacity from 5.6 to 11.3 million liters.The tank will require hydrostatic testing as per the API 650 standard prior to being commissioned for use by August 31, 2018. The newly constructed 5.7 million litre tank will be filled with water for the purpose of checking the integrity of the welded joints. The tank will be filled at a rate of 299 m3/day. This application is for the use of 5.7 million litres of water from natural water ponds near the QEC power plant and city’s Geraldine Lake to perform hydrostatic testing on the fuel tank. The water will remain in the tank for at least 24 hours once the tank is filled to detect any leaks. After hydrostatic testing, the proposed plan is to discharge the test water into a stream adjacent to the power plant where it will flow out into the ocean.
Assessment Phase / Activity
- Received Project Licences, Permits and Authorizations from AA 2023-11-06
- Application screening completed 2018-03-22
- NOI Issued 2018-03-22
- SDR Issued 2018-03-22
- Board voting 2018-03-22
- Extention to Screening Deadline requested 2018-03-14
- Opportunity to Respond 2018-03-09
- Received Comment submissions from Parties: Notice re comments received 2018-02-22
- Commenting period 2018-02-21
- Date NIRB Decision Due set 2018-01-31
- Application screening started 2018-01-31
Region
- South Baffin
Project Images
Document Categories (click to open )
Search within selected category
All project documents;?>

Click on the


Comment Form for NIRB Screenings
We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).
Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...
Register an Account