Project Dashboard
Status: EXEMPT FROM SCREENING
-
NIRB File No:
09UN052
-
Application No.:
125424
-
Project Type:
Other
-
Project Name:
Drainage Improvements & Shore Protection - Pangnirtung, NU
Applicant
- Fisheries and Oceans Canada -Small Craft Harbours
- Eleanor McEwan
- 501 University Crescent
- Winnipeg, Manitoba R3T 2N6 Canada
- eleanor.mcewan@dfo-mpo.gc.ca
Primary Contact
- Fisheries and Oceans Canada -Small Craft Harbours
- Eleanor McEwan
- 501 University Crescent
- Winnipeg, Manitoba R3T 2N6 Canada
- Tel: 204-984-1102
- eleanor.mcewan@dfo-mpo.gc.ca
Regulatory Authorities
External Links
Project Summary
Project Proposal Description: Drainage Improvements & Shore Protection, Pangnirtung, NUThe Department of Fisheries and Oceans, Small Craft Harbours Branch is responsible for keeping the Pangnirtung Harbour in safe working condition. Small Craft Harbours is proposing the following work:1. Drainage Improvements:a.To prevent harbour erosion in the spring melt, Small Craft Harbours is proposing to: 1.Realign and deepen the existing drainage ditch 2.Replace the existing culverts in the drainage ditch and resurface the road over new culverts with new gravel 3.Realign and resurface the existing harbour access road and upper road with new gravel 4.Remove the old culverts, resurface the parking area with new gravel, and install rock shore protection to prevent future erosion 5.Install rock erosion control in new drainage ditch to ensure it functions properly in the spring2. Berm Extension: a.To prevent the entrance channel of the harbour from infilling, Small Craft Harbours is proposing to: 1.Construct a rock berm extension between harbour entrance channel and tidal drainage outlet3. Breakwater Upgrades:a.To keep the existing harbour in good working condition, Small Craft Harbours is proposing to: 1.Install armour stone on the existing breakwater in areas required 2.Install additional gravel on fixed wharves where required 3.Install rock for shore protection/erosion control on inner basin of the harbour
Assessment Phase / Activity
- Exempt from Screening 2025-02-13
- Exempt from Screening 2019-01-10
- Application screening started 2019-01-10
Region
- South Baffin
Project Images
Document Categories (click to open )
- Correspondence (1)
- Project Proposal (10)
- Conformity Determination (3)
Project Application
Screening
Search within selected category
All project documents;?>
Click on the
Comment Form for NIRB Screenings
We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).
Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...
Register an Account