Project Dashboard
Status: EXEMPT FROM SCREENING
-
NIRB File No:
19YN031
-
Application No.:
125473
-
Project Type:
Scientific Research
-
Project Name:
Fisheries and Oceans Canada - Small Craft Harbour - Four Harbour Feasibility Study Field Program
Applicant
- Fisheries and Oceans Canada -Small Craft Harbours
- Eleanor McEwan
- 501 University Crescent
- Winnipeg, Manitoba R3T 2N6 Canada
- eleanor.mcewan@dfo-mpo.gc.ca
Primary Contact
- Advisian
- Victoria Burdett-Coutts
- 500-4321 Still Creek Drive
- Burnaby, British Columbia V5C6S7 Canada
- Tel: 778 9455501
- victoria.coutts@advisian.com
Regulatory Authorities
External Links
Project Summary
Advisian has been retained by Fisheries and Oceans Canada – Small Craft Harbours Program (DFO-SCH) to conduct an engineering feasibility study for the construction of small craft harbour (SCH) for four communities in Nunavut: Arctic Bay, Grise Fiord, Resolute Bay, and Clyde River. To inform the feasibility study, a field program will be undertaken during the 2019 open water season to conduct environmental, geoscience, geophysics and archaeological baseline studies in each location as detailed in Table 1 1 and Figure 1 of the attached report. All locations are in the Qikiqtaaluk Region. The field program consists of the following: •Marine Field Study Wildlife Field Study•Vegetation Field Study•Geoscience Field Study•Geophysics Field Study •Archaeological Field Study Study Areas will be developed prior to mobilization into the field to encompass the following Project components: •Small Craft Harbour (SCH)•Haul Road and Quarry•Disposal at Sea sites (not confirmed if required) All Study Areas will be designed to include the maximum footprint required for construction plus a 100 m buffer. Study areas were not defined at the time of this permit application, but their predicted extent is described in Table 3 1 and displayed in Attachment 1 of the attached report. Field surveys are required to document existing conditions within the Project Study Areas and to support engineering design. A summary of the purpose and proposed methodology for each of the field studies is provided in Table 3 2 of the attached report.
Assessment Phase / Activity
- Exempt from Screening 2023-04-24
- Received Project Licences, Permits and Authorizations from AA 2022-08-15
- Received Annual Report from Proponent 2022-02-15
- Exempt from Screening 2020-12-10
- Received Annual Report from Proponent 2020-06-08
- Received Project Licences, Permits and Authorizations from AA 2020-06-08
- Application screening completed 2019-08-15
- NOI Issued 2019-08-15
- SDR Issued 2019-08-15
- Technical advisor assigned 2019-08-15
- Board voting 2019-08-15
- Board voting Extended 2019-08-14
- Board voting Extended 2019-08-12
- Board voting 2019-08-08
- Received Comment submissions from Parties: Notice re comments received 2019-07-23
- Commenting period 2019-07-18
- Application screening started 2019-06-25
Region
- North Baffin
Project Images
Document Categories (click to open )
Search within selected category
All project documents;?>

Click on the


Comment Form for NIRB Screenings
We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).
Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...
Register an Account