    Installation of an Incinerator

Completed Screening

Applicant
  • Qikiqtaaluk Environmental
  • Raquel Labranche
  • 9935 de Châteauneuf Street
  • Brossard, Quebec J4Z 3V4 Canada
  • rlabranche@qenv.ca
Primary Contact
Regulatory Authorities

QE currently operates a hazardous waste facility in Iqaluit. We would like to purchase an outdoor biomedical waste incinerator (see i8-M50 PDF attached in this application) to dispose of different types of waste including sharps, pathological and anatomical waste, surgical dressings, bandages, expired medication, pharmaceutical waste, documents, animal carcasses. We do not intend to burn any heavy metals. We would be incinerating approximately 1.5 – 2 m3 of waste daily (with an estimated weight of around 500-750 kg/weekly) and the ash will sampled and either disposed of at the local landfill or sent south. The waste is produced by the Qikiqtani General Hospital, community health centres, dentists, correctional centers, Veterinarian, RCMP, etc. Right now, we are packaging all their waste in UN-rated boxes and storing them in 20’ containers to be disposed of in the south. We would like to receive and install the incinerator this summer and have at least 2 trained operators onsite to operate the unit. The unit would be used about twice a week year-round. The air quality and wind direction will be monitored. We will refer to the Guideline for the Burning and Incineration of Solid Waste, Dept. of Environment, Nunavut Govt.Oct. 2010, Rev. 2012 and the CCME «Guidelines for the Management of Biomedical Waste in Canada rev. 1992 as guidelines for our operations. We will also update our Hazardous Waste Management Site registration. Please let us know of any other applicable regulations or guidelines not previously mentioned. We do not intend to alter the water use and waste disposal conditions covered under the current Water Licence (attached in this application). We do not believe the unit will create more risks for freshwater. Please advise us if an amendment must be made for the addition of the incinerator of if any other modifications are deemed necessary or are recommended. The I8-M50 unit will be operated using diesel fuel and will be installed in a 20 ft container (see containerized example attached). The container will include a pre-installed generator, lighting, flooring and mounted control panel. A fuel tank will be installed inside the container complete with all the necessary piping connections. The unit has a secondary chamber with a retention time of 2 sec at 850degC to reburn the exhaust gases from the waste. The emissions report demonstrates that it is below the EU standards (see Emissions EU and Emissions testing attached). The unit will never be left unattended while it is in use and it will be on a fenced lot and not accessible to the public. There will be a fire extinguisher near the unit.

Assessment Phase / Activity
  • Application screening completed 2020-09-02
  • SDR Issued 2020-09-02
  • NOI Issued 2020-09-01
  • SDR Issued 2020-09-01
  • Board voting 2020-09-01
  • Extention to Screening Deadline requested 2020-08-25
  • Board voting 2020-08-31
  • Received Comment submissions from Parties: Notice re comments received 2020-08-19
  • Received Comment submissions from Parties: Notice re comments received 2020-08-11
  • Sent Notification to Parties 2020-07-22
  • Commenting in progress 2020-07-20
  • Application screening started 2020-07-17
Region
  • South Baffin
Project Images
Click on document name to download it, or select the document to add to a download list.
Click on the icon to preview PDF.  Click on the sign to view document details.
Documents within selected category
Display per page:
Comment Form for NIRB Screenings

We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).

Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...

Register an Account