Project Dashboard

Status: EXEMPT FROM SCREENING

  • NIRB File No:

    21UN003

  • Application No.:

    125577

  • Project Type:

    Scientific Research

  • Project Name:

    Fisheries and Oceans Canada - Clyde River Small Craft Harbour - Clyde River Geotechnical and Sampling Program

Applicant
  • Fisheries and Oceans Canada -Small Craft Harbours
  • Eleanor McEwan
  • 501 University Crescent
  • Winnipeg, Manitoba R3T 2N6 Canada
  • eleanor.mcewan@dfo-mpo.gc.ca
Primary Contact

NON-TECHNICAL SUMMARYProject NameClyde River Small Craft Harbour Geotechnical and Environmental Assessment Sampling ProgramIntroductionCanadrill-CBCL Joint Venture (Canadrill-CBCL) has been retained by Public Services and Procurement Canada (PSPC) on behalf of Fisheries and Oceans Canada – Small Craft Harbours (DFO-SCH) to design a small craft harbour (SCH) in Clyde River, Nunavut. To support the design, Canadrill-CBCL proposes to carry out a geotechnical drilling and environmental assessment sampling program in March/April 2021 to assess the proposed harbour area. The purpose of the geotechnical drilling and environmental sampling program is to evaluate the ocean bottom sediments in the harbour area, obtain sediment samples for physical and chemical analysis, and obtain bedrock core (if encountered). The information obtained will be used to design the small craft harbour facility, to evaluate the environmental risks, and to obtain the necessary permits to construct the small craft harbour. Project LocationThe sampling program will be carried out in Clyde River, on the shore and ice of Patricia Bay, in the Qikiqtaaluk Region, North Baffin Island. Project DescriptionDrilling will be conducted in the nearshore harbour area, working on top of the established ice-sheet, and in the onshore area. A total of 25 boreholes will be drilled, including 7 on land at the harbour and 18 in the harbour area through the sea-ice. Drilling will occur from within a heated shack setup onsite over each drilling location. The drill and drill shack will be mounted on a skid and dragged to the drill location using a front-end loader, which will also be used to move the drill set-up to and from each borehole location. All equipment and materials will be removed from the harbour area after the drilling program is completed.Project ScheduleThe geotechnical field program is scheduled to be carried out 24-hours-a-day over approximately 15 days in March/April 2021. The field program is dependent on weather conditions with sufficient ice thickness to support personnel and equipment to drill through the ice in the nearshore area. PersonnelThe field team for the geotechnical and environmental assessment program will consist of approximately 11 people. The team will consist of personnel from Canadrill and CBCL with local support.

Assessment Phase / Activity
  • Exempt from Screening 2023-04-24
  • Minister Response Received 2021-04-26
  • Received Project Licences, Permits and Authorizations from AA 2021-04-23
  • NOI Issued 2021-03-30
  • SDR Issued 2021-03-30
  • Board voting 2021-03-26
  • Extention to Screening Deadline requested 2021-03-18
  • Board voting 2021-03-25
  • Received Comment submissions from Parties: Notice re comments received 2021-03-11
  • Commenting period 2021-03-10
  • Commenting in progress 2021-02-22
  • Commenting period 2021-02-22
  • Application screening started 2021-02-02
Region
  • North Baffin
Project Images
Comment Form for NIRB Screenings

We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).

Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...

Register an Account