Project Dashboard

Status: COMPLETED SCREENING

  • NIRB File No:

    24YN008

  • Application No.:

    125883

  • Project Type:

    Other

  • Project Name:

    Baseline Studies for Qikiqtarjuaq Marine Infrastructure

Completed Screening

Applicant
  • Government of Nunavut
  • Justin
  • PO Box 1000 Stn 620
  • Iqaluit, Nunavut (NU) X0A 0H0 Canada
  • jmcdonell@gov.nu.ca
Primary Contact

CBCL Limited (CBCL) has been retained by Government of Nunavut (GN) to provide architectural and engineering services for a deep-water port facility in Qikiqtarjuaq Nunavut. To support the design, CBCL along with their sub-consultants propose to carry out baseline field studies and traditional knowledge or Inuit Qaujimajatuqangit (IQ) gathering in the spring and summer of 2024 to assess the proposed port area and quarry locations. The information obtained will be used to design the deep-water port facility, to evaluate the environmental risks, and to obtain the necessary permits to construct the port. The field studies planned for spring and summer 2024 in Qikiqtarjuaq include the following:•Geotechnical investigation•Terrestrial surveys (wildlife, vegetation, topographic)•Marine surveys (marine fish and habitat, marine mammals, water and sediment quality, bathymetry, tides)•Archaeological assessment•IQ gatheringThe baseline field studies will be carried out in Qikiqtarjuaq, primarily in the area planned for the future marine infrastructure. The Study Area includes a Marine Study Area in Broughton Channel surrounding the future marine infrastructure, an Upland Study Area, and three potential quarry locations.The purpose of the baseline field studies and IQ gathering is to collect baseline information to support the design and permitting of the Qikiqtarjuaq Marine Infrastructure project. The geotechnical drilling program is needed to evaluate the ocean bottom sediments in the proposed port area, obtain sediment samples for physical and chemical analysis, and obtain bedrock core. The environmental baseline field program, archaeological assessment and IQ gathering will be done to gather background knowledge about the study area, determine the potential impacts of the Qikiqtarjuaq infrastructure project, and develop appropriate mitigation and monitoring plans.The baseline field studies and IQ gathering will be carried out over the late winter, spring, and summer of 2024. The geotechnical site program will be conducted over 10 to 15 days between April 1 and May 4, 2024. The environmental baseline field program and archaeological assessment will be completed over five to six days between July 15 and August 30, 2024. The IQ gathering will take place over two to four days between May 1 and August 30, 2024.

Assessment Phase / Activity
  • Received Project Licences, Permits and Authorizations from AA 2024-05-08
  • Application screening completed 2024-04-17
  • NOI Issued 2024-04-17
  • SDR Issued 2024-04-17
  • Board voting 2024-04-17
  • Received Comment submissions from Parties: Notice re comments received 2024-04-15
  • Extention to Screening Deadline requested 2024-04-04
  • Commenting period 2024-04-15
  • Application screening started 2024-03-22
Region
Project Images
Click on document name to download it, or select the document to add to a download list.
Click on the icon to preview PDF.  Click on the sign to view document details.
Documents within selected category
Display per page:
Comment Form for NIRB Screenings

We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).

Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...

Register an Account