Project Dashboard
Status: COMPLETED SCREENING
-
NIRB File No:
21CN026
-
Application No.:
125891
-
Project Type:
Infrastructure
-
Project Name:
Dundee Bight Operational Camp - Qausuittuq National park
Completed Screening
- Screening Decision Issued 2024-06-14
- File Closed 2024-06-14
Applicant
- Qausuittuq National Park
- Valerie Amarualik
- C1-1104B Qamaniqtuaq Street
- Iqaluit, Nunavut X0A 3H0 Canada
- Valerie.Amarualik@pc.gc.ca
Primary Contact
- Parks Canada
- Darrin Reid
- C1-1104B Qamaniqtuaq St,
- Iqaluit, NU X0A 3H0 Canada
- Tel: 8679751580
- darrin.reid@pc.gc.ca
Regulatory Authorities
Related Projects
External Links
Project Summary
Parks Canada installed a new temporary field camp at Dundee Bight in 2022-2023, in part, to determine its suitability as a long-term operations camp. The camp at Dundee Bight has shown to be a suitable spot for operations and an expansion is being proposed to increase functionality and staff safety. The expansion would involve the following key changes to the current camp:1)Addition of new platforms and hard sided shelters: a) shed (16’x20’), b) outhouse/garbage storage (8’x10’), c)change room/shower (6’x6’),2)Existing platform (16’x16’) will be used for hard-sided kitchen 3)Fuel tank containment (5’x5’), for one tank of fuel to operate two cabin GeoStoves.4)Water would be pumped from the nearest stream to a tank for personal use. 5)A grey water pit 4’x4’x4’ is being planned. 6) A propane incinerating toilet is planned. 7) A larger fuel cache with up to 50 fuel drums would be maintained year-round. 8) Other associated structures would include a weather station, solar panels, bear fence. The camp is expected to be used for the next 10+ years approximately 2 weeks per year in the summer, possibly at times for longer periods, and at times in spring. The existing airstrip and buildings will require ongoing basic maintenance. Access to the site will continue to be by snowmachine and aircraft, waste would continue to be transported to the waste facility in Resolute Bay.
Assessment Phase / Activity
- Application screening completed 2024-06-14
- NOI Issued 2024-06-14
- SDR Issued 2024-06-14
- Technical advisor assigned 2024-06-14
- Board voting 2024-06-12
- Technical advisor assigned 2024-06-06
- Received Comment submissions from Parties: Notice re comments received 2024-05-23
- Technical advisor assigned 2024-05-16
- Commenting period 2024-05-23
- Application screening started 2024-05-01
Region
Project Images
Document Categories (click to open )
Search within selected category
All project documents;?>

Click on the


Comment Form for NIRB Screenings
We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).
Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...
Register an Account