Project Dashboard
Status: COMPLETED SCREENING
-
NIRB File No:
24XN057
-
Application No.:
126018
-
Project Type:
Coastal Infrastucture
-
Project Name:
Kugaaruk Sealift Improvements Project
Completed Screening
- Screening Decision Issued 2024-12-05
- File Closed 2024-12-16
Applicant
- Hamlet - Kugaaruk
- Hamlet of Kugaaruk SAO
- ,
- sao@kugaaruk.ca
Primary Contact
- Tetra Tech Canada Inc.
- Richard Hoos
- 1000, 885 Dunsmuir Street
- Vancouver, British Columbia V6C 1NS Canada
- Tel: 604 813 4952
- Rick.Hoos@tetratech.com
Regulatory Authorities
External Links
Project Summary
The Hamlet of Kugaaruk has determined that the community’s existing barge landing area, including the barge landing ramp and cargo laydown/storage area need to be expanded to accommodate future anticipated Hamlet sealift needs. In particular, the barge landing expansion project is proposed to include:Barge Landing AreaExpansion of the existing barge landing area (0.76ha) to 45m wide to accommodate two (2) barges concurrently.Boulder and bedrock blasting in the lower intertidal zone, followed by rockfill and gravel placement during low tide conditions.Sealift Laydown Area-Expansion of the existing on-land sealift laydown area from its current size (0.5 ha) to 1.0 ha.-Drainage improvements to the perimeter of the current sealift laydown area. Excavation and bedrock blasting as necessary, followed by gravel and rockfill placement to create the expanded level sealift laydown area.Sealift Laydown AreaWidening of the existing access road from 8 m to 10 m.Improving existing steep vertical grades (approx.. 10-12% grades) along approximately 100 m. of the existing access road,Excavation and bedrock blasting as necessary, followed by gravel and rockfill placement.Additional proposed Infrastructure (Optional)Security Office insulated with Generator, powered heating and lighting.Security fence surrounding laydown area (320 m).Road and caution signage in both English and Inuktitut.
Assessment Phase / Activity
- Application screening completed 2025-02-05
- NOI Issued 2025-02-05
- SDR Issued 2025-02-05
- Board voting 2025-02-04
- Received Comment submissions from Parties: Notice re comments received 2025-01-27
- Sent Notification to Parties 2025-01-08
- Technical advisor assigned 2024-12-17
- Commenting period 2025-01-24
- Application screening started 2024-12-17
Region
Project Images
Document Categories (click to open )
- Correspondence (1)
- Project Proposal (10)
- Public Notice (6)
- Comment Submissions (4)
- Screening Decision Report (3)
- Conformity Determination (2)
Project Application
Screening
Search within selected category
All project documents;?>

Click on the


Comment Form for NIRB Screenings
We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).
Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...
Register an Account