Status: COMPLETED SCREENING
-
NIRB File No:
25XN002
-
Application No.:
126022
-
Project Type:
Coastal Infrastucture
-
Project Name:
Chesterfield Inlet Sealift Improvements Project
Completed Screening
- Screening Decision Issued 2025-02-21
- File Closed 2025-01-10
Applicant
- Chesterfield Inlet SAO
- ,
- sao@chesterfield-inlet.ca
Primary Contact
- Tetra Tech Canada Inc.
- Richard Hoos
- 1000, 885 Dunsmuir Street
- Vancouver, British Columbia V6C 1NS Canada
- Tel: 604 813 4952
- Rick.Hoos@tetratech.com
Regulatory Authorities
External Links
Project Summary
Chesterfield Inlet is planning improvements to the Community’s sealift area. The following improvements are proposed to address the primary issues associated with the current sealift facility:1. Expanded Laydown AreaThe improvements will involve the reclamation of land immediately east of the Northern Store and the existing sealift ramp, with an overall increase of approximately 0.5 hectares of laydown space.2.Sealift Ramp ResurfacingThe existing sealift ramp requires some upgrades, including resurfacing the lower part of the ramp with a granular substrate in order to improve traction for the operation of heavy machinery.3.Boulder ClearingThere are many large boulders present in the sealift area that impede the efficient landing of barges and the operation of heavy equipment in the intertidal zone. These boulders will be removed to facilitate barge landings and unloading operations. 4.LightingLighting will be installed at both the sealift ramp and laydown area. Components will include standard Qulliq Energy Corporation poles and LED flood lights. Standard road and caution signs will be installed in both Inuktitut and English.Proposed DesignThe project is located within the municipal boundaries of the Hamlet of Chesterfield Inlet at approximately N63°20’ 26”, W 90°41’ 52”.Tetra Tech considered a 30-year design life for the proposed laydown area pad and shoreline protection works. To reduce the chance (probability) of a storm event with a return period of once in 50 years, to occur during the assumed design lifetime of the laydown area, the pad will be built to a +4.5 m GD crest elevation.Aggregate material for the project will be taken from the municipality’s existing quarry, west of the community and within municipal boundaries, or from other sources further west that have already been approved for use. Approximately 0.5 hectares of new laydown space will be created in the upper intertidal zone of the small embayment. The intertidal zone in this area is typically relatively unproductive due to annual freezing and ice scouring conditions. it should also be noted that the new riprap shoreline area to be constructed to protect the expanded sealift laydown area will provide new rocky marine habitat and provide sheltered habitat between the rocks for marine invertebrates such as amphipods, isopods and marine worms.
Assessment Phase / Activity
- Application screening completed 2025-02-24
- NOI Issued 2025-02-24
- SDR Issued 2025-02-24
- Board voting 2025-02-19
- Received Comment submissions from Parties: Notice re comments received 2025-02-10
- Commenting period 2025-02-07
- Application screening started 2025-01-10
Region
Project Images
Document Categories (click to open )
Search within selected category
All project documents;?>

Click on the


Comment Form for NIRB Screenings
We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).
Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...
Register an Account