Project Dashboard
Status: ACTIVE SCREENING
-
NIRB File No:
16YN040
-
Application No.:
126154
-
Project Type:
Scientific Research
-
Project Name:
Western Hudson Bay geoscience for infrastructure project
Active Screening
- NPC Referral Received 2025-02-28
- Proposal Accepted as Complete 2025-04-01
- Start of Public Comment Period 2025-04-10
- End of Public Comment Period 2025-04-22
- Proposal Remitted to Board 2025-04-25
- Completed Screening
Applicant
- Natural Resources Canada
- Anne-Marie LeBLanc
- 601 Booth St
- Ottawa, Ontario K1A 0E8 Canada
- anne-marie.leblanc@nrcan-rncan.gc.ca
Primary Contact
- Natural Resources Canada
- Greg Oldenborger
- 183-601 Booth St.
- Ottawa, ON K1A0E8 Canada
- Tel: 613 943 4288
- greg.oldenborger@canada.ca
Regulatory Authorities
External Links
Project Summary
This is a request for the continuation of the Western Hudson Bay geoscience for infrastructure project (NIRB #16YN040). While keeping Rankin Inlet as one of our main study sites, we would now like to expand our work more south, in the vicinity of Arviat. All proposed methods in this new field area are the same as the methods documented in the existing project (16YN040) and described herein. This will allow us to have a South-North transect of representative and various conditions. Methods would include:1) Shallow drillings (0-3 m) with light portable drilling tools and potentially taking advantage (if any on site) of an Air Track drill (10-20 m) typically used in arctic communities for construction work (pile installation);2) Permafrost coring (0-3 m);3) Instrumentation (ground temperature sensors) in those boreholes;4) Ground-based geophysical surveys (electrical and electromagnetics surveys);5) Drone imagery;6) Site visits to validate remote sensing products. Environmental impact is estimated to be very low, and no long-term environmental impacts are expected. The proposed work will not have any important impact on wildlife or on the major habitats that support the wildlife. No temporary camp will be installed. All work will be conducted based out of Arviat with surveys, samplings and instrumented site locations accessed daily by truck or ATVs and at a walking distance from the ATV/road network. Specific sites would be revised based on field conditions and interest by the community. There will be no operations within Inuit Owned Lands. No helicopter would be used.
Assessment Phase / Activity
- Board voting 2025-04-25
- Received Comment submissions from Parties: Notice re comments received 2025-04-25
- Commenting period 2025-04-25
- Application screening started 2025-04-02
Region
Project Images
Document Categories (click to open )
Search within selected category
All project documents;?>

Click on the


Comment Form for NIRB Screenings
We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).
Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...
Register an Account