Project Dashboard
Status: ACTIVE SCREENING
-
NIRB File No:
25YN033
-
Application No.:
126174
-
Project Type:
Scientific Research
-
Project Name:
Investigative Studies for the Iqaluit Nukkiksautiit Project
Active Screening
Applicant
- Nunavut Nukkiksautiit Corporation
- Heather Shilton
- P.O. Box 1228
- Iqaluit, NU X0A0H0 Canada
- hshilton@qcorp.ca
Primary Contact
- Nunavut Nukkiksautiit Corporation
- Heather Shilton
- P.O. Box 1228
- Iqaluit, NU X0A0H0 Canada
- Tel: 8672224658
- hshilton@qcorp.ca
Regulatory Authorities
External Links
Project Summary
Planned and Ongoing WorkPhase 3: Front-End Engineering and Design (FEED) began in late 2024. Key aspects of Phase 3 are commercial activities, preliminary engineering, investigative, and engagement. Below is a list of field activities to be completed in 2025.Environmental Baseline Studies-GeophysicaloOpportunistic field sampling (soil, surface water, groundwater) will be completed in Year 1 in cooperation with field teams deployed for other disciplines.-TerrestrialoAn extensive network of wildlife cameras surrounding the primary proposed reservoir will be deployed and in a buffered area surrounding the road routing. These cameras allow also for non- wildlife analysis.oDuring camera deployment, the wildlife team will be accompanied by a terrestrial ecosystem specialist to complete ecosystem and wildlife habitat assessments at each camera location.-BirdsoAerial surveys and point count surveys for breeding birdsoCount stations distributed throughout areas of proposed disturbanceoStandwatch surveys along the proposed road routes to document current patterns of bird flight behaviour where vertical structures may be constructed.-Fish and Fish HabitatoOpportunistic field sampling will be completed in Year 1 in cooperation with field teams deployed for other disciplines.oWith permitting requirements for fish sampling and collection, it is anticipated that this sampling would be limited to water sampling.-Groundwater HydrologyoOpportunistic field sampling in cooperation with field teams deployed for other disciplines.oContinuation of hydrometric monitoringArchaeological AssessmentThe assessment will be carried out on foot, and by ATV, using two boats with outboard. The team will move systematically through the entire shoreline that will be flooded, scanning the surface for archaeological material. Newly recorded sites will be mapped, including individual features. Although the surface of the site will be examined for artifacts, there will be no collections made, and no digging or site alteration will be undertaken.Geophysical/Geotechnical Data CampaignUse of ground-penetrating-radar (GPR) or similar methods for non-invasive geophysical data collection. Additionally test pitting for surface materials will be completed for both engineering and environmental purposes.LiDAR Data CollectionLiDAR Data Collection of the proposed Project area including potential corridors for linear infrastructure will be completed. The primary goals of the LiDAR Data Collection are to capture topographic data and Orthophotos for the Project area. This data will help with engineering and design as well as planning. Temporary Camp EstablishmentThis camp will support on-site activities for the 2025 field season. Supply of lodging, communication tools, and supply of necessary supplies for extended occupation of the camp.Human Environment-May 2025oValidate field season data collection program plans with Rightsholders and incorporate Inuit Qaujimajatuqangit.oContinue to engage with the Rightsholders and stakeholders on routing the Project access road and other linear infrastructure.-June 2025oShare finalized data collection program plans with the publicoAdvertise field work employment opportunities for IqalungmiutoSummer, 2025: monthly updates from the Site on field data collection program progress-November 2025oValidate field season data and associated analysis with Rightsholders and incorporate Inuit Qaujimajatuqangit.oContinue to engage with the Amaruq Hunters and Trappers association on routing the Project access road and other linear infrastructureoConduct a project naming initiative with Inukshuk high school.-General Engagement Activities Throughout 2025oCommencement of the Socio-economic AssessmentoCommence engagement with the community of Panniqtuuq
Assessment Phase / Activity
- Commenting in progress 2025-06-06
- Application screening started 2025-05-15
Region
Project Images
Document Categories (click to open )
Search within selected category
All project documents;?>

Click on the


Comment Form for NIRB Screenings
We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).
Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...
Register an Account