Project Dashboard
Status: ACTIVE SCREENING
-
NIRB File No:
25XN030
-
Application No.:
126185
-
Project Type:
Coastal Infrastucture
-
Project Name:
Qikiqtarjuaq Marine Infrastructure Project
Active Screening
Applicant
- Government of Nunavut
- Justin
- PO Box 1000 Stn 620
- Iqaluit, Nunavut (NU) X0A 0H0 Canada
- jmcdonell@gov.nu.ca
Primary Contact
- CBCL
- Loretta Hardwick
- 112 Kent Street, Suite 400, Tower B
- Ottawa, Ontario K1A 0W8 Canada
- Tel: 3435522235
- lhardwick@cbcl.ca
Regulatory Authorities
External Links
Project Summary
The Government of Nunavut is planning to build a deep-water port facility in Qikiqtarjuaq Nunavut. The Project will be built in the Municipality of Qikiqtarjuaq, along the western shoreline of Broughton Island, south of the Qikiqtarjuaq Airport. The purpose of the project is to improve marine infrastructure in the community and provide facilities to support the fishing industry and marine traffic in the Davis Strait and Baffin Bay. This project will consist of a new wharf structure complete with modern equipment and tools to accommodate commercial, scientific, and tourist vessels. The Project will consist of the following components:•75 m long closed-face marginal wharf structure with armour stone protection•275 m access road connecting to existing municipal roads•Crane for offloading cargo•Wastewater receiving systems•VHF radio communications station•Freezer container facilities•Operations and security office•Power distributionConstruction will involve both land-based (e.g., site preparation, rock quarrying) and marine-based activities (e.g., harbour dredging, construction of wharf and armour stone protection). Rock and fill will be excavated from a new quarry within the municipality. A temporary camp will be established to accommodate workers during construction. Traffic between construction areas and the camp, quarry, and stockpile areas will make use of existing roads. A 275 m access road will be built to connect the new port facility to the existing municipal road.Approximately 25 to 30 personnel will be required during construction. Commercial accommodations in in the community may be limited, and if so, a temporary work camp will be required during construction. Construction personnel will be present during the open-water season and those that are not residents of Qikiqtarjuaq will depart for the winter.Construction equipment will include trucks and heavy equipment, such as excavators, front end loaders, compactor, bulldozer, grader, forklift, crane, pile driver or vibratory hammer, drilling rigs, and rock crusher. Tugs, work boats, scows, and a barge will be used for marine construction. Diesel will be the primary fuel used for the construction vehicles and equipment. Vehicles and equipment will be refuelled at designated areas that have spill prevention measures in place. Environmental mitigation measures, including spill prevention and emergency response, will be included in a Construction Environmental Management Plan. Construction will occur over four years from 2026 to 2029, with construction shut down over the winter seasons. Mobilization of equipment and materials, and potentially some site preparation works, will occur in 2026. The majority of construction will occur in 2027, 2028, and 2029. Operation of the port is expected to begin at the start of the open-water season in 2030.The project will bring potential benefits to the community. During construction, there will be economic benefits through direct local hiring, renting of community facilities, and local purchases. After the project is completed, benefits will include deepwater accommodation for commercial vessels, storage on site for commercial fishery, and more efficient offloading of goods for the community. The project overall will provide economic benefit to the community and the region by offering infrastructure necessary to develop commercial fisheries. Community engagement activities were conducted as part of feasibility studies in 2005 and 2020, and have continued during the design stage in 2023 and 2024. Meetings were held with the Council, the local Hunters and Trappers Association (HTA), the local QIA representatives, community members and knowledge holders.During the community consultation, Inuit Qaujimajatuqangit (IQ) was gathered through design workshops with the local HTA and with local Inuit hunters and fishers in Qikiqtarjuaq. Information was gathered on the state of the local environment, historical and current use, and community needs for a deep sea port. All IQ is considered to be the intellectual property of the Inuit knowledge holders. The IQ collected was considered in the design of project.IQ was used to evaluate the impact of construction activities on the environment. The environmental and safety concerns raised during the IQ workshops and community consultations are addressed through the design and planned mitigation measures.
Assessment Phase / Activity
- Commenting in progress 2025-07-03
- Application screening started 2025-06-27
Region
- South Baffin
Project Images
Document Categories (click to open )
- Project Proposal (12)
- Public Notice (6)
Screening
Search within selected category
All project documents;?>

Click on the


Comment Form for NIRB Screenings
We appreciate your feedback/input. However you are currently not registered on the site (or your session has expired).
Registering for an account takes only moments and will provide you with more options/opportunities to participate in the NIRB process...
Register an Account