Nutaat Titiqqat
Last 30 days
| Uplua | Iliurainnarialik PDF-mik unaluuniit Word-mik piumayanganik | Public Registry Entry |
|---|---|---|
| 2025-12-31 | 251231-25XN041-Report App B Topographic Survey-IR1E.pdf | Long Term Water Project (LTWP) |
| 2025-12-31 | 251231-25XN041-Report App A Drawings Pt.2-IR1E.pdf | Long Term Water Project (LTWP) |
| 2025-12-31 | 251231-25XN041-Report App A Drawings Pt.1-IR1E.pdf | Long Term Water Project (LTWP) |
| 2025-12-31 | 251231-25XN041-Preliminary Design Report-IR1E.pdf | Long Term Water Project (LTWP) |
| 2025-12-31 | 251231-25XN041-Site Plans-IR1E.pdf | Long Term Water Project (LTWP) |
| 2025-12-31 | 251231-25XN041-Compliance Assessment-IR1E.pdf | Long Term Water Project (LTWP) |
| 2025-12-31 | 251231-25XN041-Consultation Report-IR1E.pdf | Long Term Water Project (LTWP) |
| 2025-12-31 | 251231-25XN041-2024 Financial Statements-IR1E.pdf | Long Term Water Project (LTWP) |
| 2025-12-31 | 251231-25XN041-Application-IR1M.pdf | Long Term Water Project (LTWP) |
| 2025-12-30 | 251230-25XN041-SIG Concordance-IR1E.pdf | Long Term Water Project (LTWP) |